人造草坪籃球場選擇什么樣的草坪來施工
作者: 來源: 日期:2020/4/19 17:12:41 人氣:3885
人造草坪籃球場地的基層有瀝青混凝土和水泥混凝土兩種。籃球場地的施工:重要是控制好排水方向和場地的平整不能出現(xiàn)凹凸不平狀,施工時(shí)可以用5mx5m方格網(wǎng)控制(人工鋪瀝青混凝土),或在水泥混凝土施工時(shí),支立好模板的高程,用模板控制。
The base of the artificial turf basketball court is made of asphalt concrete and cement concrete. The construction of basketball court: it is important to control well the drainage direction and the leveling of the ground without any bumps and bumps. During the construction, 5mx5m grid can be used to control (manually spread asphalt concrete), or the elevation of the formwork can be set up and controlled by the formwork.
在人造草坪面層施工時(shí),首先要選擇草苗長度在11~12mm長的人造草,不要選用30mm以上的人造草,這種短草苗的人造草鋪裝后不用充填砂和黑膠粒。但人造草坪的安裝需要由專業(yè)人員,采用專門的設(shè)備進(jìn)行。人造草來料是整卷供貨,按場地尺寸進(jìn)行切割,草坪鋪裝接口,要用專用接口帶,并涂膠水粘接,接口帶寬度為20~30cm,也就是在縫的兩側(cè)各有不少于10~15cm的接口帶,短草苗的草坪接縫最好不用機(jī)械縫制的方法接,防止接縫處凸起,點(diǎn)的距離為50cm,鋪后,可用人工碾,碾壓1~2遍,使接縫和粘接點(diǎn)粘牢。
In the construction of artificial turf surface, first of all, the artificial grass with the length of 11~12mm should be selected instead of the artificial grass with the length of more than 30mm. However, the installation of artificial turf needs to be carried out by professionals with special equipment. Incoming supply is the whole volume, artificial grass cutting according to the size of venue, the lawn shop interface, with a special interface zone, and the adhesive glue, interface zone width is 20 ~ 30 cm, which is in the seam has not less than 10 ~ 15 cm on both sides of the interface zone, short grass lawn sewn seams best without mechanical method, convex, prevent the joint point of the distance of 50 cm, after the shop, by manual grinding, crushing 1 ~ 2 times, make joint and contact cement.
人造草坪鋪裝的時(shí)間和溫度有很大關(guān)系,溫度太低時(shí)鋪裝,在夏季嚴(yán)熱時(shí)會(huì)出現(xiàn)鼓脹現(xiàn)象,施工季節(jié)、時(shí)間、氣溫,應(yīng)選擇在常溫狀態(tài)下進(jìn)行操作最好。運(yùn)動(dòng)場休閑人造草坪多少錢一平方就找運(yùn)之家。
The time that the man-made lawn shop installs and temperature have very big concern, when temperature is too low, the shop is installed, in the summer when severe heat appears bloat phenomenon, construction season, time, air temperature, should choose to undertake operation is best under normal temperature condition.